Work Energy and Power
Practice questions
A 1 kg block is projected up a 30° incline at 8 m/s with a constant friction force of 3 N. It returns to its starting point with speed (g = 10 m/s²):
- 8 m/s
- 6 m/s
- 4 m/s
- 2 m/s
Answer and explanation
Answer: C
It travels up 4 m, since 8d = 32 J. Coming down, KE = 5 × 4 − 3 × 4 = 8 J, so v = 4 m/s.
A spring storing 2 J launches a 1 kg block over a horizontal surface with a friction force of 2 N. The block travels:
- 0.5 m
- 2 m
- 4 m
- 1 m
Answer and explanation
Answer: D
Friction work 2 × d equals the stored energy 2 J, so d = 1 m.
A ball dropped from 10 m rebounds to 6 m. The percentage of its mechanical energy lost in the bounce is:
- 6%
- 40%
- 60%
- 4%
Answer and explanation
Answer: B
Energy is proportional to height, so the loss is (10 − 6)/10 = 40%.
A car at 10 m/s skids to rest on a road with μ = 0.25 (g = 10 m/s²). The skid distance is:
- 10 m
- 50 m
- 40 m
- 20 m
Answer and explanation
Answer: D
d = v² ÷ (2μg) = 100 ÷ (2 × 0.25 × 10) = 100 ÷ 5 = 20 m.
A 2 kg block slides from rest 4 m down a 30° incline against a friction force of 6 N (g = 10 m/s²). Its speed at the bottom is:
- 4 m/s
- 2 m/s
- 8 m/s
- 6 m/s
Answer and explanation
Answer: A
PE lost = 2 × 10 × 2 = 40 J. Friction work = 24 J. KE = 16 J, so v = 4 m/s.
A 1000 kg car, with no resistance, is accelerated from rest by a constant force of 2000 N. The power at t = 5 s is:
- 4 kW
- 10 kW
- 40 kW
- 20 kW
Answer and explanation
Answer: D
a = 2 m/s², so v = 10 m/s at 5 s. P = F v = 2000 × 10 = 20 kW.
A 750 W iron is used for 4 hours. The energy used is:
- 3 kWh
- 750 kWh
- 0.19 kWh
- 30 kWh
Answer and explanation
Answer: A
Energy = 0.75 kW × 4 h = 3 kWh.
An engine delivering 30 kW moves a car at a steady 15 m/s. The driving force is:
- 450 N
- 2 N
- 4500 N
- 2000 N
Answer and explanation
Answer: D
F = P ÷ v = 30 000 ÷ 15 = 2000 N.
A pump delivers 3 kW of useful power and has an efficiency of 75%. Its input power is:
- 2.25 kW
- 4 kW
- 3 kW
- 3.75 kW
Answer and explanation
Answer: B
Input = output ÷ efficiency = 3 ÷ 0.75 = 4 kW.
A crane lifts a 400 kg load at a steady speed of 3 m/s (g = 10 m/s²). The power needed is:
- 1.2 kW
- 4 kW
- 12 kW
- 120 kW
Answer and explanation
Answer: C
F = mg = 4000 N. P = F v = 4000 × 3 = 12 000 W = 12 kW.
A 1 kg block is dropped from 0.4 m above a spring of constant 1000 N/m (g = 10 m/s²). The maximum compression of the spring is:
- 0.2 m
- 0.1 m
- 0.04 m
- 0.4 m
Answer and explanation
Answer: B
mg(0.4 + x) = ½ k x² gives 500x² − 10x − 4 = 0, with positive root x = 0.1 m.
A ball is thrown at 20 m/s at 30° above the horizontal. Its speed at the highest point is about:
- about 10 m/s
- about 20 m/s
- zero
- about 17 m/s
Answer and explanation
Answer: D
At the top, only the horizontal component remains: 20 cos 30° ≈ 17.3 m/s.
A ball is thrown at 10 m/s from a height of 15 m in some direction. It reaches the ground with speed (g = 10 m/s²):
- 20 m/s
- 25 m/s
- 15 m/s
- depends on the direction
Answer and explanation
Answer: A
v² = u² + 2gh = 100 + 300 = 400, so v = 20 m/s, whatever the direction of throw.
A 0.5 kg bob on a 0.8 m string is released from the horizontal. At the lowest point the tension in the string is:
- 5 N
- 10 N
- 20 N
- 15 N
Answer and explanation
Answer: D
v² = 2gl = 16. T = mg + mv²/l = 5 + 0.5 × 16 ÷ 0.8 = 5 + 10 = 15 N.
A body slides from rest down a smooth slope from a height of 3.2 m (g = 10 m/s²). Its speed at the bottom is:
- 6.4 m/s
- 16 m/s
- 8 m/s
- 4 m/s
Answer and explanation
Answer: C
v = √(2gh) = √(2 × 10 × 3.2) = √64 = 8 m/s.
A 2 kg block at rest gains 16 J of kinetic energy from a variable force. Its speed is:
- 8 m/s
- 4 m/s
- 16 m/s
- 2 m/s
Answer and explanation
Answer: B
½ × 2 × v² = 16, so v² = 16 and v = 4 m/s.
A force F = (2x + 1) N acts through a displacement from x = 0 to x = 3 m. The work done is:
- 7 J
- 21 J
- 12 J
- 9 J
Answer and explanation
Answer: C
The force rises from 1 N to 7 N, so the work is the area of the trapezium: ½ × (1 + 7) × 3 = 12 J.
A spring of constant 300 N/m is stretched from 5 cm to 15 cm. The work done is:
- 1.5 J
- 6.75 J
- 0.3 J
- 3 J
Answer and explanation
Answer: D
W = ½ × 300 × (0.15² − 0.05²) = 150 × 0.02 = 3 J.
A force of +8 N acts for 2 m, then −4 N for the next 3 m. The net work is:
- 4 J
- 28 J
- 12 J
- 16 J
Answer and explanation
Answer: A
8 × 2 = 16 J and −4 × 3 = −12 J. The total is 4 J.
A force rises uniformly from 0 to 10 N over a displacement of 6 m. The work done is:
- 60 J
- 30 J
- 15 J
- 10 J
Answer and explanation
Answer: B
The graph is a triangle: ½ × 6 × 10 = 30 J.