• Practice
  • About 15 min
  • 5 practice questions

Moving targets: growth in the base and repayments

Work out the new lending a bank needs next year when its ANBC grows and part of its priority sector book is repaid.

If something looks wrong, please tell us.

Targets are not hit once and forgotten. Each year the base, ANBC, usually grows, so the rupee amount required grows with it. At the same time some existing priority loans are repaid and leave the book. Exam questions combine these two movements, and most wrong answers come from forgetting one of them. As in the foundation course, every target, rate and amount here is invented for practice; the real figures are set and revised by the RBI.

The three movements

Track three things separately. The new requirement: target % × new ANBC. The surviving book: present priority loans minus repayments during the period. The new lending needed: new requirement minus surviving book, if positive. Write these three lines every time, and the question cannot trap you.

A shortcut for a bank exactly on target

If a bank is exactly on target today and nothing is repaid, it only needs to keep pace with the growth of the base: extra lending = target % × increase in ANBC. If some loans are repaid, add the repayments, because they must be replaced too. If the bank is already short today, add the present shortfall as well. In one line: new lending = present shortfall + target % × increase in ANBC + repayments. This gives the same answer as the three-line method and is a useful check.

Worked example 1: growth and repayments

Suppose a bank's ANBC is ₹2,000 crore and is expected to grow by 10% next year. The target is 40%. Its priority loans are ₹820 crore today, and ₹100 crore of them will be repaid during the year. Working: new ANBC = 2,000 × 1.10 = ₹2,200 crore; new requirement = 0.40 × 2,200 = ₹880 crore. Surviving book = 820 − 100 = ₹720 crore. New lending needed = 880 − 720 = ₹160 crore. Check with the one-line formula: present shortfall = 800 − 820 is negative, a surplus of ₹20 crore, so: −20 + 0.40 × 200 + 100 = −20 + 80 + 100 = ₹160 crore.

Worked example 2: exactly on target

Suppose a bank with ANBC of ₹1,500 crore has priority loans of exactly ₹600 crore, meeting a 40% target. Next year ANBC rises by ₹300 crore and ₹50 crore of priority loans are repaid. Working: extra lending = 0.40 × 300 + 50 = 120 + 50 = ₹170 crore. Check: new requirement = 0.40 × 1,800 = ₹720 crore; surviving book = 600 − 50 = ₹550 crore; 720 − 550 = ₹170 crore.

Common traps

  • Applying the target to the increase in ANBC only, when the bank is already short today: the present shortfall must be added.
  • Forgetting repayments: a repaid loan no longer counts, so it must be replaced.
  • Applying the growth rate to the priority book instead of to ANBC.
  • Using last year's ANBC for this year's requirement.

New lending = new requirement − surviving book. Equivalently: present shortfall (or minus surplus) + target % × increase in ANBC + repayments.

These problems feel long, but each line is a single multiplication or subtraction. Write the three lines, compute each, and use the one-line formula as a check. If the two routes disagree, one of the movements has been missed. In a multiple-choice question, the wrong options are usually built from exactly these slips: one ignores repayments, one ignores the present shortfall, and one applies the target to the whole new base without subtracting the book.

Key takeaways: the requirement grows with the base; repayments shrink the book and must be replaced; a present shortfall or surplus carries into next year; and the three-line method and the one-line formula should always agree.

Check your understanding

  1. 1. Suppose ANBC of ₹3,000 crore grows by 20%, the target is 40%, priority loans are ₹1,200 crore and ₹150 crore will be repaid. How much new priority lending is needed?

    1. ₹240 crore
    2. ₹1,440 crore
    3. ₹90 crore
    4. ₹390 crore
    Show answer

    Answer: D. New ANBC = 3,600; requirement = 1,440; surviving book = 1,200 − 150 = 1,050; 1,440 − 1,050 = ₹390 crore.

  2. 2. Suppose a bank is exactly on a 40% target with ANBC of ₹2,000 crore. ANBC rises by ₹500 crore and nothing is repaid. How much extra priority lending is needed?

    1. ₹500 crore
    2. ₹200 crore
    3. ₹1,000 crore
    4. ₹40 crore
    Show answer

    Answer: B. Extra lending = 0.40 × 500 = ₹200 crore.

  3. 3. Suppose a bank is short by ₹50 crore today. ANBC rises by ₹100 crore, the target is 40%, and nothing is repaid. How much new priority lending is needed?

    1. ₹40 crore
    2. ₹90 crore
    3. ₹50 crore
    4. ₹140 crore
    Show answer

    Answer: B. Present shortfall + 0.40 × increase = 50 + 40 = ₹90 crore. ₹40 crore forgets the present shortfall.

  4. 4. Suppose ANBC grows from ₹1,000 crore to ₹1,250 crore, the target is 40%, priority loans are ₹400 crore and ₹60 crore are repaid. How much new lending is needed?

    1. ₹100 crore
    2. ₹60 crore
    3. ₹500 crore
    4. ₹160 crore
    Show answer

    Answer: D. Requirement = 0.40 × 1,250 = 500; surviving book = 400 − 60 = 340; 500 − 340 = ₹160 crore. Check: 0 + 0.40 × 250 + 60 = 160.

  5. 5. Why must repayments be added when working out next year's new priority lending?

    1. Repayments raise the ANBC
    2. Repayments are deposited in the RIDF
    3. Repaid loans leave the book and no longer count toward the target
    4. Repayments count twice toward the target
    Show answer

    Answer: C. A repaid loan is no longer outstanding, so it must be replaced to keep the book at the required level.

Privacy · Terms · Refunds · Delivery