- Foundation
- About 20 min
- 5 practice questions
Case study: Indira Gandhi Canal command area and sustainability
Describe the Indira Gandhi Canal system and its two stages in words, evaluate its positive and negative effects on ecology, economy and society, and explain the seven measures proposed for sustainable development of its command area.
If something looks wrong, please tell us.
By the end of this lesson you can
- Describe the origin, course, length and two stages of the Indira Gandhi Canal.
- Evaluate its environmental and agricultural effects, positive and negative.
- Explain the seven measures for sustainable development of the command area.
Irrigation can turn desert into farmland, but if it is not managed carefully it can also ruin that farmland. The Indira Gandhi Canal in the Thar desert is the textbook's case study of this double effect.
The canal system
The Indira Gandhi Canal, earlier the Rajasthan Canal, is one of India's largest canal systems. It was conceived by Kanwar Sain in 1948 and launched on 31 March 1958. It starts at the Harike barrage in Punjab and runs parallel to the Pakistan border, on average about 40 km from it, through the Thar desert (Marusthali) of Rajasthan. According to the textbook, its total planned length is about 9,060 km and its culturable command area about 19.63 lakh hectares, of which about 70 per cent was planned for flow irrigation and the rest for lift irrigation. In a lift canal, water is lifted so it can flow against the slope of the land. All lift canals start from the left bank of the main canal; all channels on the right bank are flow channels.
| Feature | Stage I | Stage II |
|---|---|---|
| Districts | Ganganagar, Hanumangarh, northern Bikaner | Bikaner, Jaisalmer, Barmer, Jodhpur, Nagaur, Churu |
| Terrain | Gently undulating | Desert with shifting sand dunes; summer temperatures up to about 50°C |
| Culturable command area (textbook) | 5.53 lakh ha | 14.10 lakh ha |
| Irrigation began | Early 1960s | Mid-1980s |
| Planned use | Protective irrigation | Extensive irrigation of crops and pasture development |
Worked example 1: checking the command area figures
Using the textbook's figures: Stage I 5.53 lakh ha + Stage II 14.10 lakh ha. Working: 5.53 + 14.10 = 19.63 lakh ha, which equals the total culturable command area. Flow irrigation at 70 per cent = 0.70 × 19.63 ≈ 13.74 lakh ha; lift = 19.63 − 13.74 ≈ 5.89 lakh ha. Answer: totals agree; about 13.7 lakh ha by flow and 5.9 lakh ha by lift.
Effects on environment and agriculture
Effects of canal irrigation in the command area
-
Positive
- Soil moisture available for longer
- Greening through afforestation and pasture programmes
- Less wind erosion and less siltation of canals
- More cultivated area and higher cropping intensity
- Big early rise in crop and livestock productivity
-
Negative
- Intensive irrigation and excess water use
- Waterlogging
- Soil salinity
- Long-run threat to the sustainability of agriculture
Soil moisture had always limited farming here. Canal water increased cultivated area and cropping intensity, and traditional crops (gram, bajra, jowar) were replaced by wheat, cotton, groundnut and rice. That intensive irrigation is what caused the twin problems of waterlogging and soil salinity. Various scholars have questioned the project's ecological sustainability, and the textbook says the course of development over four decades has largely validated their doubts.
Worked example 2: explaining a crop change
Question: Why did farmers switch from bajra and gram to rice and cotton after the canal arrived, and what was the cost? Working: bajra and gram are hardy dryland crops; with assured canal water, higher-value but water-hungry crops such as rice and cotton became possible and more profitable. But flooding fields in a desert with poor drainage raises the water table (waterlogging), and evaporation leaves salts (salinity). Answer: water made high-value crops profitable, but over-use created waterlogging and salinity.
Seven measures for sustainable development
Five of the seven proposed measures aim to restore ecological balance:
- Strict implementation of water management policy: protective irrigation in Stage I, extensive irrigation of crops and pasture in Stage II.
- No water-intensive crops in the cropping pattern; encourage plantation crops such as citrus fruits.
- Effective Command Area Development programmes, lining of water courses, land development and levelling, and warabandi (equal distribution of canal water within an outlet's command area), to reduce conveyance losses.
- Reclaim land affected by waterlogging and soil salinity.
- Eco-development through afforestation, shelterbelt plantation and pasture development, especially in fragile Stage II.
- Social sustainability: financial and institutional support for land allottees with poor economic backgrounds.
- Economic sustainability: develop other sectors along with agriculture and animal husbandry, diversifying the economy and linking basic villages, agro-service centres and market centres.
In the Indira Gandhi Canal area, the most crucial factor for sustainability is eco-development: managed water use, suitable crops, reclamation and tree and pasture cover.
Worked example 3: classifying the measures
Sort the seven measures into ecological, social and economic. Working: measures 1-5 (water management, crop choice, CAD and warabandi, reclamation, eco-development) restore ecological balance; measure 6 (support to poor allottees) is social; measure 7 (diversification and linkages) is economic. Answer: five ecological, one social, one economic, matching the textbook's statement that five of the seven address ecology.
Key takeaways: The Indira Gandhi Canal (conceived 1948, launched 1958) runs from Harike barrage through the Thar parallel to the border, irrigating Stage I (gentle terrain, from the early 1960s) and Stage II (dune desert, from the mid-1980s) by flow and lift channels. It greened the land, cut wind erosion and raised output, but intensive irrigation brought waterlogging and salinity. Sustainability needs strict water management, no water-intensive crops, CAD and warabandi, reclamation, eco-development, support for poor allottees and a diversified economy.
Check your understanding
-
1. The Indira Gandhi Canal originates at:
- Bhakra dam
- Harike barrage in Punjab
- Hirakud dam
- Kota barrage
Show answer
Answer: B. The canal starts at the Harike barrage in Punjab and runs through the Thar desert of Rajasthan.
-
2. Which twin environmental problems has intensive irrigation caused in the command area?
- Waterlogging and soil salinity
- Floods and landslides
- Glacial retreat and avalanches
- Coastal erosion and cyclones
Show answer
Answer: A. The textbook names waterlogging and soil salinity as the twin problems from intensive irrigation and excessive water use.
-
3. Warabandi refers to:
- a type of lift canal
- a shelterbelt plantation
- equal distribution of canal water in the command area of an outlet
- a drought-resistant crop
Show answer
Answer: C. Warabandi is the system of equal distribution of canal water among users in the command area of an outlet.
-
4. Which crops replaced the traditional gram, bajra and jowar after canal irrigation?
- Tea and coffee
- Jute and rubber
- Ragi and moong
- Wheat, cotton, groundnut and rice
Show answer
Answer: D. Intensive irrigation led farmers to replace gram, bajra and jowar with wheat, cotton, groundnut and rice.
-
5. Assertion (A): The most crucial factor for sustainable development in the Indira Gandhi Canal command area is eco-development. Reason (R): Five of the seven measures proposed are meant to restore ecological balance.
- Both A and R are true, and R is the correct explanation of A
- Both A and R are true, but R is not the correct explanation of A
- A is true, but R is false
- A is false, but R is true
Show answer
Answer: A. Both are true, and the emphasis of the proposals on ecological balance reflects that ecological restoration is the key to sustainability here. R explains A.
Sign in to keep track of the lessons you finish.