• Foundation
  • About 16 min
  • 5 practice questions

Opportunity cost and the production possibility curve

Define opportunity cost, read a production possibility curve, and use it to work out the trade-off between two goods and the meaning of points on, inside and outside the curve.

If something looks wrong, please tell us.

By the end of this lesson you can

  • Define opportunity cost and find it in everyday choices.
  • Read a production possibility schedule and curve.
  • Calculate the opportunity cost of moving along a PPC.

Every choice has a hidden price: the best thing you gave up to make it. Economists call this the opportunity cost. This lesson explains the idea and shows a simple graph that makes trade-offs visible.

Opportunity cost

When one alternative is chosen, the others are given up. The value of what is given up is the opportunity cost. If you spend an evening watching a film instead of practising cricket, the opportunity cost of the film is the practice you missed. Time is also a scarce resource, so how you spend it always has an opportunity cost.

Opportunity cost: the value of the next best alternative given up when a choice is made.

The production possibility curve (PPC)

Suppose a farmer has a fixed piece of land, water and labour and can grow two crops, rice and pulses (an example with made-up figures). Using all resources fully, the farmer can produce different combinations:

A production possibility schedule (made-up figures)
CombinationRice (kg)Pulses (kg)
P0200
Q50180
R100140
S15080
T2000

Plotting these points with rice on the x-axis and pulses on the y-axis gives a downward-sloping curve, the Production Possibility Curve (PPC): the curve showing the different combinations of two goods that can be produced using all available resources. Moving from P towards T, the farmer produces more rice and less pulses. To get more rice, some pulses must be sacrificed: that sacrifice is the opportunity cost of rice.

Reading positions relative to the PPC

  • On the curve
    • Maximum output
    • Resources used fully and efficiently
    • More of one means less of the other
  • Inside the curve
    • Resources unused or wasted
    • More of both is possible
  • Outside the curve
    • Not possible with present resources and technology

All points on the PPC show the maximum output possible with efficient use of resources and no waste. The PPC helps enterprises and governments plan and decide.

Worked example 1: Opportunity cost along the curve

Using the table: P to Q: rice rises by 50 kg, pulses fall from 200 to 180, so the opportunity cost of 50 kg of rice is 20 kg of pulses. Q to R: pulses fall 180 − 140 = 40 kg. R to S: 140 − 80 = 60 kg. S to T: 80 − 0 = 80 kg. Each extra 50 kg of rice costs more pulses than the last, because land and labour that suit pulses best are being shifted to rice. That is why the PPC bends outward.

Worked example 2: Inside, on or outside?

The farmer actually grows 100 kg rice and 100 kg pulses. Check: the schedule shows 100 kg rice can come with 140 kg pulses, so 100 kg is less than possible: this point lies inside the curve, meaning some resources are idle or wasted. A plan for 150 kg rice and 120 kg pulses lies outside the curve, since 150 kg rice allows only 80 kg pulses: impossible with present resources. A plan for 50 kg rice and 180 kg pulses is on the curve: efficient.

Key takeaways: Opportunity cost is the value of the best alternative given up. The PPC shows the combinations of two goods that can be produced with all resources used fully; it slopes downward because more of one good means less of the other. Points on the curve are efficient, points inside show waste, and points outside cannot be reached with present resources. Moving along the curve, the opportunity cost of each extra unit usually rises.

Check your understanding

  1. 1. Riya has ₹200 and chooses a book over a pair of earphones she also wanted. What is the opportunity cost of the book?

    1. The earphones
    2. The book
    3. ₹200 saved
    4. Nothing
    Show answer

    Answer: A. The opportunity cost is the next best alternative given up, which is the earphones.

  2. 2. Why does a PPC slope downward?

    1. Because resources are unlimited
    2. Because producing more of one good requires giving up some of the other
    3. Because prices always fall
    4. Because the government controls output
    Show answer

    Answer: B. With fixed resources, shifting them to one good reduces the other, so the curve slopes downward.

  3. 3. Using the lesson's table, what is the opportunity cost of moving from R (100 rice, 140 pulses) to S (150 rice, 80 pulses)?

    1. 40 kg of pulses
    2. 50 kg of rice
    3. 60 kg of pulses
    4. 80 kg of pulses
    Show answer

    Answer: C. Pulses fall from 140 to 80: 140 − 80 = 60 kg of pulses given up for 50 kg more rice.

  4. 4. A point inside the PPC means:

    1. Maximum efficient output
    2. Unlimited resources
    3. Output that is impossible
    4. Some resources are unused or wasted
    Show answer

    Answer: D. Inside the curve, more of both goods could be produced, so resources are not fully or efficiently used.

  5. 5. Assertion: All points on a PPC show efficient use of resources. Reason: Points on the curve represent the maximum output possible with available resources and no wastage.

    1. Both Assertion and Reason are true, and the Reason correctly explains the Assertion
    2. Both Assertion and Reason are true, but the Reason does not explain the Assertion
    3. The Assertion is true, but the Reason is false
    4. The Assertion is false, but the Reason is true
    Show answer

    Answer: A. Both are true; maximum output with no waste is what efficiency means, so the Reason explains the Assertion.

Privacy · Terms · Refunds · Delivery