• Practice
  • About 13 min
  • 5 practice questions

Calculation drill: talk time, handouts, ratios, percentages and file size

Solve the six numerical question types about presentations with a fixed method for each: time, handouts, ratios, percentages, animation and file size.

If something looks wrong, please tell us.

A few questions in every presentation paper are small calculations. They need no special knowledge, only care with the formula and the rounding. All values below are illustrative practice numbers, not facts about any software or exam.

Methods

Six question types
QuestionMethodRounding
Length of a talkslides x minutes per slideNone
Handout pagesslides / slides per pageRound up
Total sheets for a grouppages per person x number of peopleNone
Slide heightwidth x 9 / 16 (16:9) or width x 3 / 4 (4:3)None
Slides with a featurepercentage x total slides / 100None
Animation timesum of the durations plus any delaysNone
File size after compressionoriginal x remaining fractionNone

Before calculating, underline the numbers and the unit asked for. Convert seconds to minutes (divide by 60) or MB to KB (multiply by 1024) first, so that every number in the formula uses the same unit, and write the working in one line so that an error is easy to find.

Worked example 1: talk length

A talk has 18 slides at 1.5 minutes each. Length = 18 x 1.5 = 27 minutes. If the slot is 30 minutes, 3 minutes are left over, enough for a short question session.

Worked example 2: handouts

A deck of 45 slides is printed as handouts with 4 slides per page. Pages = 45 / 4 = 11.25, which must be rounded up to 12 pages per copy. For 30 people, 12 x 30 = 360 pages. If printed on both sides of the paper, the number of sheets is 360 / 2 = 180 sheets.

Worked example 3: widescreen height

A 16:9 slide is 40 cm wide, so the height is 40 x 9 / 16 = 360 / 16 = 22.5 cm. A 4:3 slide of the same width would be 40 x 3 / 4 = 30 cm high.

Worked example 4: percentages

In a 40-slide deck, 15 percent of the slides contain video and 35 percent contain pictures. Video slides = 15 x 40 / 100 = 6. Picture slides = 35 x 40 / 100 = 14. Slides with neither (assuming none has both) = 40 - 6 - 14 = 20.

Worked example 5: animation timing

Six bullet points enter one after another. Each entrance takes 0.75 second, so with no gaps the total is 6 x 0.75 = 4.5 seconds. If a delay of 0.25 second is added between consecutive animations, there are 5 gaps, giving 4.5 + 5 x 0.25 = 4.5 + 1.25 = 5.75 seconds. Note the number of gaps is one fewer than the number of animations.

Worked example 6: file size

A deck contains 12 pictures of 1.5 MB each, so the pictures total 12 x 1.5 = 18 MB. After compression each picture keeps 40 percent of its size. New total = 18 x 40 / 100 = 7.2 MB, a saving of 18 - 7.2 = 10.8 MB.

Slides x minutes; slides / per page rounded up; width x 9 / 16; percent x total / 100; delays are one fewer than animations.

Common traps

  • Rounding handout pages down.
  • Counting as many delays as animations.
  • Using 16:3 or 9:16 instead of 9 / 16 for the height.
  • Forgetting that two-sided printing halves the sheets, not the pages.

Check your understanding

  1. 1. A talk has 24 slides at 2 minutes each. How long is it?

    1. 12 minutes
    2. 24 minutes
    3. 36 minutes
    4. 48 minutes
    Show answer

    Answer: D. 24 x 2 = 48 minutes.

  2. 2. Handouts of 50 slides are printed with 6 slides per page. How many pages are needed per copy?

    1. 9
    2. 8
    3. 10
    4. 7
    Show answer

    Answer: A. 50 / 6 = 8.33, rounded up to 9 pages.

  3. 3. A 16:9 slide is 64 cm wide. What is its height?

    1. 48 cm
    2. 32 cm
    3. 36 cm
    4. 27 cm
    Show answer

    Answer: C. 64 x 9 / 16 = 36 cm.

  4. 4. In a 60-slide deck, 25 percent of the slides have charts. How many is that?

    1. 10
    2. 12
    3. 20
    4. 15
    Show answer

    Answer: D. 25 x 60 / 100 = 15 slides.

  5. 5. Five animations of 1 second each run in sequence with a 0.5-second delay between consecutive ones. What is the total time?

    1. 6.5 seconds
    2. 7 seconds
    3. 7.5 seconds
    4. 5.5 seconds
    Show answer

    Answer: B. Total = 5 x 1 + 4 x 0.5 = 5 + 2 = 7 seconds.

Privacy · Terms · Refunds · Delivery