• Practice
  • About 14 min
  • 5 practice questions

Calculations: ore grade, quantity of ore needed and units of electricity

Practise percentage-of-ore problems, finding how much ore a target mass of metal needs, and kilowatt-hour and cost calculations.

If something looks wrong, please tell us.

Calculation questions in this topic use two skills: percentages for ores and alloys, and energy equals power times time. They look different but follow a pattern. This lesson gives the patterns, a table of conversions and the usual traps. All figures are illustrative practice numbers.

Pattern 1: metal in the ore

Metal present = grade (as a decimal) x mass of ore. If only part of the metal is recovered, multiply by the recovery as a decimal too.

Worked example 1: forward

Question: How much iron is in 2,500 kg of ore of grade 48 percent, with 100 percent recovery? Working: 0.48 x 2,500 = 1,200 kg. Answer: 1,200 kg.

Pattern 2: ore needed

To find the ore needed for a target mass of metal, divide the target by the grade (and by the recovery).

Worked example 2: backward

Question: A factory needs 300 kg of iron. The ore is 60 percent iron and all of the iron is recovered. How much ore must be mined? Working: 300 / 0.60 = 500 kg. Check: 0.60 x 500 = 300. Answer: 500 kg.

Worked example 3: with losses

Question: Only 80 percent of the iron in a 60 percent ore is recovered. How much ore is needed for 288 kg of iron? Working: iron obtained per kg of ore = 0.60 x 0.80 = 0.48 kg. Ore = 288 / 0.48 = 600 kg. Answer: 600 kg.

Worked example 4: comparing two ores

Question: Ore X is 50 percent iron and ore Y is 30 percent iron. How much of each is needed to obtain 300 kg of iron at full recovery? Working: X: 300 / 0.50 = 600 kg. Y: 300 / 0.30 = 1,000 kg. Answer: 600 kg of X or 1,000 kg of Y. The richer ore needs less mining, less transport and less waste, which is why grade decides which deposits are worked first.

Pattern 3: electrical energy

Conversions
FromTo
1 kW1,000 W
1 MW1,000 kW
1 kWh1 unit on a bill
EnergyPower x time

Worked example 5: a plant

Question: A 5 MW plant runs at full power for 4 hours. Find the energy in MWh and kWh. Working: 5 x 4 = 20 MWh. 20 MWh = 20 x 1,000 = 20,000 kWh. Answer: 20 MWh or 20,000 kWh.

Worked example 6: a bill

Question: A pump of 750 W runs for 8 hours a day for 10 days. If a unit costs 6 rupees (an illustrative rate), what is the cost? Working: 750 W = 0.75 kW. Energy per day = 0.75 x 8 = 6 kWh. For 10 days = 60 kWh. Cost = 60 x 6 = 360 rupees. Answer: 360 rupees.

Common traps

  • Multiplying by the percentage when the question asks for ore needed; it needs division.
  • Forgetting recovery losses.
  • Treating watts as kilowatts, which makes the answer 1,000 times too big.
  • Mixing MWh and kWh.

Metal = grade x ore; ore = metal / grade; energy = power x time.

— Remember

Key takeaways: decide whether the question goes forward or backward; keep percentages as decimals; convert watts to kilowatts first.

Check your understanding

  1. 1. An ore of grade 25 percent weighs 800 kg. At full recovery the metal is:

    1. 100 kg
    2. 200 kg
    3. 32 kg
    4. 320 kg
    Show answer

    Answer: B. 0.25 x 800 = 200 kg.

  2. 2. A factory needs 90 kg of metal from an ore of grade 30 percent, with full recovery. The ore needed is:

    1. 27 kg
    2. 120 kg
    3. 270 kg
    4. 300 kg
    Show answer

    Answer: D. 90 / 0.30 = 300 kg.

  3. 3. A 40 MW plant runs for 6 hours. The energy generated is:

    1. 240 MWh
    2. 46 MWh
    3. 34 MWh
    4. 6.7 MWh
    Show answer

    Answer: A. 40 x 6 = 240 MWh.

  4. 4. A 500 W machine runs for 4 hours. The units used are:

    1. 20
    2. 2
    3. 0.5
    4. 5
    Show answer

    Answer: B. 0.5 kW x 4 h = 2 kWh = 2 units.

  5. 5. At 5 rupees a unit (illustrative), 12 units cost:

    1. 17 rupees
    2. 50 rupees
    3. 60 rupees
    4. 120 rupees
    Show answer

    Answer: C. 12 x 5 = 60 rupees.

Privacy · Terms · Refunds · Delivery