Explain Taylor's techniques: functional foremanship, standardisation and simplification of work, method study, motion study, time study, fatigue study and the differential piece wage system, with worked calculations.
If something looks wrong, please tell us.
By the end of this lesson you can
- Draw the structure of functional foremanship and state each foreman's job.
- Distinguish standardisation from simplification and the four work studies from one another.
- Calculate wages under the differential piece wage system and a standard task from time study.
Taylor's principles were put into practice through a set of techniques developed from his experiments.
Functional foremanship
The foreman is the manager workers meet face to face every day; the textbook calls him the lowest-ranking manager and the highest-ranking worker. Taylor listed the qualities a good foreman needs, including intelligence, education, tact, grit, judgment, special knowledge, manual dexterity, energy, honesty and good health, and found that no single person has them all. He therefore separated planning from execution right down to the shop floor and proposed eight specialist foremen. Under the factory manager are a planning in-charge and a production in-charge, each with four specialists. Each worker takes orders from all eight in their area. Functional foremanship extends division of work and specialisation to the shop floor.
Functional foremanship
-
Planning in-charge
Four specialists who plan the work.
- Instruction card clerk: drafts instructions for workers
- Route clerk: specifies the route of production
- Time and cost clerk: prepares time and cost sheets
- Disciplinarian: ensures discipline
-
Production in-charge
Four specialists who supervise execution.
- Speed boss: timely and accurate completion of the job
- Gang boss: keeps machines and tools ready for workers
- Repair boss: keeps machines and tools in working order
- Inspector: checks the quality of work
Standardisation and simplification of work
Standardisation is setting standards for every business activity: process, raw material, time, product, machinery, methods or working conditions. These standards are benchmarks to be followed. Its objectives are to reduce a product line to fixed types, sizes and characteristics; to make parts interchangeable; to set standards of quality for materials; and to set standards of performance for workers and machines.
Simplification aims to eliminate unnecessary varieties, sizes and dimensions of products. It saves labour, machine and tool costs, reduces inventories, uses equipment more fully and increases turnover.
The four work studies
| Study | What it examines | Purpose |
|---|---|---|
| Method study | The whole sequence from buying raw materials to delivering the product | Find the one best way of doing a job; minimise cost, maximise quality and customer satisfaction |
| Motion study | Movements such as lifting, sitting and changing position | Remove unnecessary movements; separate productive, incidental and unproductive motions |
| Time study | Time taken for each element of a well-defined job, from several readings | Fix standard time, decide the number of workers, frame incentive schemes and labour costs |
| Fatigue study | Amount and frequency of rest intervals | Let workers regain energy and keep productivity high |
Method study led to the concept of the assembly line. Through motion study, Taylor's associate Frank Gilbreth reduced the motions in bricklaying from 18 to 5. Fatigue can be caused by long hours, unsuitable work, poor relations with the boss or bad working conditions, and such causes should be removed.
Differential piece wage system
Taylor favoured paying by the piece but at two different rates: a higher rate for workers who reach or exceed the standard output found by work-study, and a lower rate for those below it. This rewards efficient workers and gives the others a strong reason to improve.
Differential piece wage: standard output is fixed by work-study; workers at or above standard are paid a higher rate per unit, those below standard a lower rate.
Worked example 1: differential piece wage (illustrative figures)
Suppose the standard output in a made-up factory is 20 units a day. Workers producing 20 or more units are paid ₹30 per unit; those producing fewer are paid ₹25 per unit. Worker P makes 22 units and worker Q makes 18 units.
| Worker | Units made | Standard met? | Rate per unit (₹) | Wage for the day (₹) |
|---|---|---|---|---|
| P | 22 | Yes | 30 | 22 × 30 = 660 |
| Q | 18 | No | 25 | 18 × 25 = 450 |
Difference = 660 − 450 = ₹210. If Q had been paid ₹30 a unit, Q would have earned 18 × 30 = ₹540, so the lower rate costs Q ₹90. The gap of ₹210 is meant to motivate Q to reach the standard.
Worked example 2: standard task from time study (illustrative)
Several observations show that a worker takes 15 minutes to pack one gift hamper. A shift is 8 hours, of which 1 hour is for lunch and rest. Working: hampers per hour = 60 ÷ 15 = 4. Working hours = 8 − 1 = 7. Standard task = 7 × 4 = 28 hampers per shift. Wages and the number of workers needed can now be fixed on this basis.
Worked example 3: name the technique
(a) A made-up shoe company cuts its range from 40 sizes and colours of a sandal to 12 popular ones. (b) It finds that packers walk to a far shelf for boxes and moves the shelf next to the packing table. (c) It gives workers on the heavy stitching machines a ten-minute pause every two hours. Answer: (a) simplification, (b) motion study, (c) fatigue study.
Key takeaways: functional foremanship separates planning from execution through eight specialist foremen. Standardisation sets benchmarks; simplification removes needless variety. Method, motion, time and fatigue studies find the best way, remove wasted movement, fix standard time and set rest periods. The differential piece wage system pays a higher rate to those who meet the standard.
Check your understanding
-
1. Under functional foremanship, the foreman responsible for keeping machines and tools ready for operation by workers is the:
- speed boss
- route clerk
- gang boss
- inspector
Show answer
Answer: C. The gang boss keeps machines and tools ready for workers. The speed boss ensures timely completion, the route clerk specifies the route of production, and the inspector checks quality.
-
2. Which technique aims at eliminating unnecessary varieties, sizes and dimensions of products?
- Standardisation
- Simplification
- Method study
- Time study
Show answer
Answer: B. Simplification removes superfluous variety in products, saving costs and reducing inventory. Standardisation sets standards or benchmarks for activities.
-
3. In a made-up factory, standard output is 12 units a day; the rate is ₹40 per unit at or above standard and ₹32 per unit below it. A worker making 10 units earns:
- ₹400
- ₹480
- ₹320
- ₹384
Show answer
Answer: C. 10 units is below the standard of 12, so the lower rate applies: 10 × 32 = ₹320. (At the higher rate it would have been 10 × 40 = ₹400, which does not apply.)
-
4. The main objective of time study is to:
- determine the standard time for a job and use it to fix the number of workers, incentives and labour cost
- remove unnecessary movements
- decide rest intervals
- reduce the number of product sizes
Show answer
Answer: A. Time study fixes the standard time for a well-defined job from several readings; it is used to decide the number of workers, frame incentive schemes and determine labour costs.
-
5. Assertion (A): Functional foremanship is an extension of the principle of division of work and specialisation. Reason (R): Under it, each worker receives orders from only one foreman.
- Both A and R are true, and R is the correct explanation of A
- Both A and R are true, but R is not the correct explanation of A
- A is true, but R is false
- A is false, but R is true
Show answer
Answer: C. A is true: eight specialists divide the foreman's work. R is false: under functional foremanship each worker takes orders from eight foremen, which is why it conflicts with unity of command.