Revision notes

Environmental Impact Assessment: Foundation

The key points, rules to remember, tables and diagrams from all 5 lessons, on one page for quick revision. To keep a copy, use your browser's Print and choose "Save as PDF".

Lesson 1

What environmental impact assessment is and why it matters

EIA = studying the likely environmental and social effects of a project BEFORE it is approved, so that harm can be avoided, reduced, or the project refused.

Key takeaways: EIA is a study done before approval; it covers people as well as nature; its aim is to improve or, if needed, stop a project; it began with the US National Environmental Policy Act of 1969; the Rio Declaration of 1992 supported it; in India, EIA rules are made under the Environment (Protection) Act, 1986.

Read the full lesson

Lesson 2

The EIA process step by step

Screening → Scoping → Baseline → Prediction → Mitigation → Public consultation → Decision → Monitoring. Screening asks 'whether', scoping asks 'what'.

Key takeaways: EIA follows a sequence of stages; screening decides whether a project needs EIA, scoping decides what to study, the baseline records the present state, prediction estimates change, mitigation finds remedies, consultation hears the public, the decision approves, attaches conditions or refuses, and monitoring checks the project after it starts.

Read the full lesson

Lesson 3

Screening and scoping: deciding what to study

Screening = whether and how much study (by size, type and location). Scoping = what to study (key issues and alternatives, including the no-project option).

Key takeaways: screening sorts projects into categories by scale and type, and a sensitive location can raise the level; exact thresholds belong to each country's rules and change over time; scoping chooses the significant issues and writes them into terms of reference; alternatives, including the no-project option, are part of scoping.

Read the full lesson

Lesson 4

Baseline study and predicting impacts

Main parts of a baseline study
Part of the environmentExamples of what is recorded
AirDust and gases in the air, wind direction
WaterRiver flow, water quality, groundwater level
LandSoil type, land use, slopes and erosion
NoisePresent noise levels near homes and schools
Living thingsPlants, animals, birds, fish, any rare species
PeoplePopulation, jobs, health, homes, cultural sites

Baseline first: you cannot measure change without knowing the starting point. Significance ≈ magnitude × importance. Irreversible impacts deserve the most attention.

Key takeaways: the baseline records air, water, land, noise, living things and people, across seasons and over the whole area the project could affect; impacts can be positive or negative, direct or indirect, short or long term, reversible or irreversible, and cumulative; a matrix that multiplies magnitude by importance helps rank impacts.

Read the full lesson

Lesson 5

Mitigation, public consultation, decision and monitoring

Mitigation hierarchy: Avoid → Minimise → Restore → Offset. Decisions: approve, approve with conditions, or reject. Monitoring makes conditions real.

Key takeaways: avoid harm first and offset last; measures go into an environmental management plan; public consultation brings local knowledge and fairness; decisions can approve, approve with conditions or reject; monitoring checks the project keeps its promises; cumulative assessment looks at many projects together, and strategic environmental assessment looks at policies, plans and programmes.

Read the full lesson

Privacy · Terms · Refunds · Delivery