• Foundation
  • About 13 min
  • 5 practice questions

Canal irrigation: headworks, distributaries and the tail end

Follow water from a dam or weir through main canal, branches and distributaries to the fields, and see why farmers at the far end often get less.

If something looks wrong, please tell us.

A canal is an artificial channel that carries river water to farmland. It is the biggest irrigation system in the plains, and exam questions on it test whether you understand how the pieces fit together. This lesson walks the water from the river to the field and explains the usual trouble at the far end.

From river to field

Water is first held back or diverted at the headworks, a structure built across the river. A dam stores a large volume in a reservoir. A weir is a low wall that raises the water level a little and lets the extra flow over the top. A barrage is a row of gates across the river that can be raised or lowered to control how much water goes into the canal. From the headworks the water enters the main canal, which divides into branch canals, then distributaries, then smaller minors and finally field channels (watercourses) that reach each farm.

The canal network, from large to small
LevelJob
Headworks (dam, weir, barrage)Raise or store water and let it into the canal
Main canalCarries the whole supply over a long distance
Branch canal and distributaryShare the water among districts and villages
Minor and field channelBring water to individual fields

Why canals flow by gravity

Canal water moves by gravity, so the canal must run along a slightly higher line than the fields it serves. Engineers therefore build canals along the ridge between two rivers, from where water can flow down to both sides. A canal that is too steep erodes its bed; one that is too flat leaves silt behind and chokes. This is why canals are most common on gently sloping plains and rarely cross steep hilly land.

Command area and the tail end

The command area is the land that a canal can supply. The farms near the head of a distributary are called head-end farms and those far down are tail-end farms. Head-end farmers can take water first, and some take more than their share. By the time the water reaches the tail end, little may remain. Water is also lost on the way by seepage through the bed and by evaporation.

Worked example 1: arrange the order

Question: Arrange these in the order water meets them: field channel, main canal, weir, distributary. Working: water is first raised or diverted at the weir; it then enters the main canal; the main canal feeds distributaries; the distributary feeds field channels. Answer: weir, main canal, distributary, field channel.

Worked example 2: a loss on the way

Question: Suppose a canal takes in 100 units of water at its head and 30 units are lost by seepage and evaporation before the fields. How much reaches the fields, and what share is lost? (The numbers are illustrative.) Working: 100 - 30 = 70 units reach the fields. Share lost = 30 / 100 = 30 percent. Answer: 70 units reach the fields; 30 percent is lost, which is why lining the canal with concrete or brick helps.

Ways to help the tail end

  • Lining canals to reduce seepage.
  • Rotational supply, in which each group of farmers gets water in turn on fixed days.
  • Repairing gates and keeping channels free of silt and weeds.
  • Charging for water by use, so that taking more than needed has a cost.

Headworks raise water, main canal carries it, distributaries share it, field channels deliver it; seepage and tail-end shortage are the weak points.

— Remember

Key takeaways: a dam stores, a weir raises, a barrage controls; canals flow by gravity along ridges; the command area is what a canal can supply; lining and rotational supply reduce losses and tail-end shortage.

Check your understanding

  1. 1. Which structure is a row of gates across a river used to control the flow into a canal?

    1. Weir
    2. Barrage
    3. Tank
    4. Check dam
    Show answer

    Answer: B. A barrage has gates that can be raised or lowered to control the water entering a canal. A weir is a fixed low wall.

  2. 2. Canals are usually aligned along a ridge because:

    1. Water then flows down to both sides by gravity
    2. Ridges always hold the most rainfall
    3. Soil on ridges is always saline
    4. Canals must climb to reach the fields
    Show answer

    Answer: A. Water moves downhill by gravity, so a canal on the high ground can feed land on either side.

  3. 3. The land that a canal can supply is called its:

    1. Catchment
    2. Floodplain
    3. Delta
    4. Command area
    Show answer

    Answer: D. The command area is the land a canal can serve. The catchment is the area that drains into a river.

  4. 4. A canal takes in 200 units of water and 50 units are lost on the way. What percentage reaches the fields? (Illustrative numbers.)

    1. 50 percent
    2. 25 percent
    3. 75 percent
    4. 80 percent
    Show answer

    Answer: C. 200 - 50 = 150 units reach the fields; 150 / 200 = 0.75, so 75 percent. The loss is 25 percent.

  5. 5. Which step best helps tail-end farmers?

    1. Letting head-end farmers take more
    2. Lining the canal and supplying water in turns
    3. Closing the minors of the canal
    4. Building the fields at a higher level
    Show answer

    Answer: B. Lining reduces seepage and rotational supply shares water fairly, so more reaches the far end of the canal.

Sign in to keep track of the lessons you finish.

Next lesson → Crops, seasons and their water needs

Privacy · Terms · Refunds · Delivery