• Practice
  • About 14 min
  • 5 practice questions

Pipes opened at different times

Handle a pipe that joins later or pipes opened one after another, and find when a late pipe must be opened so the tank fills on time.

If something looks wrong, please tell us.

The mirror image of closing a pipe midway is opening a pipe late. Questions may start pipes one after another, open an outlet once the tank is half full, or ask when a second pipe should be opened to finish on time. Draw a simple timeline and every one of these becomes a short calculation.

Draw the timeline

Split the time into intervals in which the same pipes are open. In each interval, units added = net rate × length of the interval. Keep a running total until it reaches the capacity. A small table keeps this tidy.

Worked example 1: one pipe joins later

Pipe A fills a tank in 12 hours and pipe B in 8 hours. A is opened first and B is opened 2 hours later. When is the tank full? Capacity = LCM(12, 8) = 24 units; A = 2, B = 3. First 2 hours: A alone adds 4 units. Remaining 20 units at 2 + 3 = 5 units per hour take 4 hours. Total = 2 + 4 = 6 hours.

Worked example 2: three pipes one after another

Pipes A, B and C fill a tank in 12, 18 and 36 hours. A is opened at 9 am, B at 10 am and C at 11 am. At what time is the tank full? Capacity = LCM(12, 18, 36) = 36 units; A = 3, B = 2, C = 1.

IntervalPipes openUnits per hourUnits addedTotal so far
9 am to 10 amA333
10 am to 11 amA, B558
From 11 amA, B, C628 needed36

After 11 am, 28 units remain at 6 units per hour: 28 ÷ 6 = 4 2/3 hours = 4 hours 40 minutes. The tank is full at 11 am + 4 hours 40 minutes = 3:40 pm.

Worked example 3: when to open the late pipe

Pipe A fills a tank in 15 hours and pipe B in 10 hours. A is opened first. After how long should B be opened so that the tank is full in exactly 10 hours from the start? Capacity = 30 units; A = 2, B = 3. A runs all 10 hours and fills 20 units. B must fill 10 units at 3 per hour, which takes 10/3 hours = 3 hours 20 minutes. So B must run for the last 3 hours 20 minutes, which means it is opened 10 hours − 3 hours 20 minutes = 6 hours 40 minutes after the start.

Worked example 4: a leak or outlet that starts halfway

A pipe fills a tank in 6 hours. When the tank is half full, an outlet that can empty the full tank in 12 hours is also opened. How long does the tank take to fill in all? Capacity = 12 units; pipe +2, outlet −1. The first half (6 units) takes 6 ÷ 2 = 3 hours. The second half fills at 2 − 1 = 1 unit per hour and takes 6 hours. Total = 3 + 6 = 9 hours. Trap: do not apply the net rate to the whole tank (that would give 12 hours).

Draw a timeline. Units in each interval = net rate × time. A pipe opened late works for (total time − delay); an outlet opened halfway affects only the second half.

Key takeaways

  • Fill a table of intervals, pipes open, rate and units added.
  • Clock-time questions: find the hours needed, then add them to the starting time.
  • To find when to open a late pipe, count what the early pipe does in the whole time first.
  • A leak or outlet that starts partway affects only the part of the tank filled after it starts.

Check your understanding

  1. 1. Pipe A fills a tank in 10 hours and pipe B in 15 hours. A is opened first and B joins 2 hours later. How long after the start is the tank full?

    1. 6 h 48 min
    2. 6 h
    3. 7 h 12 min
    4. 8 h
    Show answer

    Answer: A. Capacity = 30 units; A = 3, B = 2. First 2 hours: 6 units. Remaining 24 units at 5 per hour: 4.8 hours = 4 hours 48 minutes. Total = 6 hours 48 minutes.

  2. 2. Pipe A, which fills a tank in 6 hours, is opened at 8 am. Pipe B, which fills it in 4 hours, is opened at 9 am. At what time is the tank full?

    1. 10:30 am
    2. 11:30 am
    3. 11 am
    4. 12 noon
    Show answer

    Answer: C. Capacity = 12 units; A = 2, B = 3. From 8 am to 9 am A adds 2 units. Remaining 10 units at 5 per hour take 2 hours, so the tank is full at 11 am.

  3. 3. Pipe A fills a tank in 20 hours and pipe B in 30 hours. A is opened first. After how many hours should B be opened so that the tank is full exactly 15 hours after the start?

    1. 5 hours
    2. 7.5 hours
    3. 10 hours
    4. 8 hours
    Show answer

    Answer: B. Capacity = 60 units; A = 3, B = 2. A works 15 hours: 45 units. B must fill 15 units at 2 per hour: 7.5 hours. So B runs for the last 7.5 hours and is opened 15 − 7.5 = 7.5 hours after the start.

  4. 4. A pipe fills a tank in 8 hours. When the tank is half full, a leak starts that alone could empty the full tank in 24 hours. How long does the tank take to fill in all?

    1. 12 hours
    2. 8 hours
    3. 14 hours
    4. 10 hours
    Show answer

    Answer: D. Capacity = 24 units; pipe +3, leak −1. First 12 units: 12 ÷ 3 = 4 hours. Last 12 units at 3 − 1 = 2 per hour: 6 hours. Total = 4 + 6 = 10 hours.

  5. 5. Pipes A, B and C fill a tank in 6, 9 and 18 hours. A is opened first, B one hour later and C two hours after the start. How long after the start is the tank full?

    1. 3 h 40 min
    2. 3 h 20 min
    3. 4 h
    4. 3 h
    Show answer

    Answer: A. Capacity = 18 units; A = 3, B = 2, C = 1. Hour 1: 3 units. Hour 2: 5 units (total 8). Then 6 units per hour for the remaining 10 units: 10 ÷ 6 = 1 2/3 hours = 1 hour 40 minutes. Total = 3 hours 40 minutes.

Sign in to keep track of the lessons you finish.

Next lesson → Leaks, flows and capacity in litres

Privacy · Terms · Refunds · Delivery