- Practice
- About 15 min
- 5 practice questions
India's nuclear programme for revision: institutions, power stations and the three stages
Revise the dates, institutions and power-station locations of India's nuclear programme, and match each of the three stages with its reactor, fuel and product.
If something looks wrong, please tell us.
Questions on India's nuclear programme mix dates, institutions, places and the logic of the three stages. Revise them as four compact tables and you can answer matching, chronology and statement questions quickly.
Timeline
| Year | Event |
|---|---|
| 1948 | Atomic Energy Commission set up (chairman Homi J. Bhabha) |
| 1954 | Department of Atomic Energy created; Atomic Energy Establishment, Trombay, set up |
| 1956 | Apsara, first research reactor in Asia, critical at Trombay |
| 1960 | Cirus research reactor, built with Canadian help, critical at Trombay |
| 1967 | Trombay establishment renamed Bhabha Atomic Research Centre |
| 1969 | Tarapur, India's first nuclear power station, in commercial operation |
| 1974 | Pokhran-I (18 May) |
| 1983 | Atomic Energy Regulatory Board set up |
| 1985 | Dhruva research reactor critical at Trombay |
| 1987 | NPCIL formed |
| 1998 | Pokhran-II (11 and 13 May); 11 May later observed as National Technology Day |
Institutions
| Body | Role |
|---|---|
| Department of Atomic Energy | Runs the programme; works directly under the Prime Minister |
| Bhabha Atomic Research Centre (Trombay, Mumbai) | Main nuclear research and development centre |
| Indira Gandhi Centre for Atomic Research (Kalpakkam) | Research on fast breeder reactors |
| Nuclear Power Corporation of India Limited | Designs, builds and operates nuclear power stations |
| Atomic Energy Regulatory Board | Safety regulator for nuclear and radiation facilities |
| Uranium Corporation of India Limited | Mines and processes uranium ore, starting at Jaduguda in Jharkhand |
| Nuclear Fuel Complex (Hyderabad) | Makes fuel for reactors |
Power stations by state
| Station | State | Note |
|---|---|---|
| Tarapur | Maharashtra | First station; its first two units are BWRs built with US collaboration |
| Rawatbhata (Rajasthan Atomic Power Station) | Rajasthan | First PHWR, built with Canadian collaboration |
| Kalpakkam (Madras Atomic Power Station) | Tamil Nadu | Also home to fast breeder research |
| Narora | Uttar Pradesh | PHWR |
| Kakrapar | Gujarat | PHWR |
| Kaiga | Karnataka | PHWR |
| Kudankulam | Tamil Nadu | Russian VVER (pressurised light water) reactors |
The three stages
| Stage | Reactor | Fuel | What it produces for the next stage |
|---|---|---|---|
| 1 | Pressurised Heavy Water Reactor | Natural uranium | Plutonium-239 in spent fuel |
| 2 | Fast Breeder Reactor | Plutonium-239 with uranium-238 | More plutonium; with a thorium blanket, uranium-233 |
| 3 | Thorium-based reactors | Thorium-232 with uranium-233 | Long-term power from India's large thorium reserves |
Worked example 1: chronology
Arrange: (1) Dhruva critical (2) Cirus critical (3) Apsara critical (4) BARC named. Working: Apsara 1956, Cirus 1960, BARC renamed 1967, Dhruva 1985. Order: 3, 2, 4, 1.
Worked example 2: statement check
Statement: 'The second stage of India's programme uses thorium as its main fuel.' Working: stage 2 runs on plutonium from stage 1; thorium is placed around the core only to breed uranium-233 for stage 3. The statement is false.
Stage 1: PHWR + natural uranium → plutonium. Stage 2: fast breeder + plutonium → more plutonium and uranium-233. Stage 3: thorium + uranium-233.
Common traps
- Apsara (1956) was the first research reactor; Tarapur (1969) the first power station.
- Pokhran is in Rajasthan; Tarapur is in Maharashtra; there are two stations in Tamil Nadu (Kalpakkam and Kudankulam).
- AERB regulates; NPCIL operates. Exams swap them.
- BARC was not founded under that name - it was renamed in 1967.
Key takeaways: revise the timeline, the who-does-what table, the station map and the stage table. Chronology and matching questions then become lookups.
Check your understanding
-
1. Kudankulam nuclear power station is located in:
- Karnataka
- Andhra Pradesh
- Kerala
- Tamil Nadu
Show answer
Answer: D. Kudankulam is in Tamil Nadu and uses Russian VVER reactors. Kaiga is the station in Karnataka.
-
2. Which body designs, builds and operates India's nuclear power stations?
- NPCIL
- AERB
- UCIL
- IGCAR
Show answer
Answer: A. Nuclear Power Corporation of India Limited operates the power stations. AERB is the regulator, UCIL mines uranium and IGCAR researches fast reactors.
-
3. Arrange in order: (1) Pokhran-II (2) NPCIL formed (3) AERB set up (4) Tarapur commercial operation
- 4, 2, 3, 1
- 4, 3, 2, 1
- 3, 4, 2, 1
- 4, 3, 1, 2
Show answer
Answer: B. Tarapur 1969, AERB 1983, NPCIL 1987, Pokhran-II 1998: the order is 4, 3, 2, 1.
-
4. In the second stage of India's nuclear programme, the main fuel is:
- Natural uranium
- Thorium-232
- Plutonium-239
- Deuterium
Show answer
Answer: C. Fast breeder reactors in stage 2 run on plutonium-239 obtained from the spent fuel of stage 1 PHWRs. Thorium is the basis of stage 3.
-
5. National Technology Day, marking the Pokhran tests of 1998, is observed on:
- 11 May
- 18 May
- 4 August
- 28 February
Show answer
Answer: A. The first of the 1998 tests took place on 11 May, observed as National Technology Day. 18 May 1974 was Pokhran-I; 28 February is National Science Day.
Sign in to keep track of the lessons you finish.