Final self-assessment: Environmental impact assessment basics
Test yourself on the whole course: 15 questions with answers explained.
If something looks wrong, please tell us.
Attempt all 15 questions before you look at any answer, and write a word or two of reasoning for each. These questions are a little harder than the lesson checks and cover the whole course. Any numbers are made up for practice.
Final self-assessment
-
1. Which statement about EIA is correct?
- It is carried out only after a project is completed, to record the damage done
- It studies only the profit and loss of a project, not its environmental effects
- It predicts likely effects of a project before approval so that harm can be avoided or reduced
- It is concerned only with wildlife and forests, never with people and their livelihoods
Show answer
Answer: C. EIA is done before approval, covers people as well as nature, and aims to prevent or reduce harm.
-
2. Which pairing is correct?
- Environment (Protection) Act, 1986: first EIA law in the world
- Rio Declaration, 1992: law that created EIA in the United States
- Brundtland report, 1987: Indian EIA rules
- US National Environmental Policy Act, 1969: first formal EIA requirement
Show answer
Answer: D. Formal EIA began with the US National Environmental Policy Act of 1969. India's Environment (Protection) Act, 1986 is the parent law for Indian EIA rules but was not the world's first.
-
3. Preventing a problem costs ₹4 crore. Without prevention, clean-up costs ₹9 crore and health costs ₹6 crore. How much does prevention save?
- ₹5 crore
- ₹11 crore
- ₹15 crore
- ₹19 crore
Show answer
Answer: B. Cost of cure = 9 + 6 = ₹15 crore; saving = 15 − 4 = ₹11 crore.
-
4. Which stage comes immediately after scoping?
- Screening
- Baseline study
- Monitoring
- Decision
Show answer
Answer: B. The order is screening, scoping, baseline, prediction, mitigation, consultation, decision, monitoring.
-
5. Arrange in order: (1) decision (2) mitigation plan (3) scoping (4) public consultation.
- 2, 3, 4, 1
- 3, 4, 2, 1
- 3, 2, 1, 4
- 3, 2, 4, 1
Show answer
Answer: D. Scoping comes early; the mitigation plan follows prediction; public consultation follows; then the decision.
-
6. 'Engineers estimate that the plant will add a certain amount of dust to the air and judge how serious that is.' Which stage is this?
- Impact prediction
- Baseline study
- Screening
- Monitoring
Show answer
Answer: A. Estimating future change and its seriousness is impact prediction; the baseline describes the present, and monitoring comes after the project starts.
-
7. A small project is planned right next to a wetland that supplies a town's drinking water. Compared with the same project on an ordinary site, screening is likely to:
- Require less study, because the project is small
- Skip the project, because size is all that matters
- Require more study, because the location is sensitive
- Leave the decision to monitoring
Show answer
Answer: C. Screening considers location as well as size; a sensitive site can raise the level of study.
-
8. Which item belongs in scoping rather than in screening?
- Deciding whether the project needs an EIA at all
- Checking dust levels after the plant opens
- Choosing which issues and alternatives the study must cover
- Approving the project with conditions
Show answer
Answer: C. Screening decides whether and at what level; scoping decides what to study, including alternatives.
-
9. Why is the no-project alternative included in an EIA?
- Because it guarantees that the project will be rejected once the comparison is done
- To avoid the need for a baseline study of the site and its surroundings
- Because it is the cheapest option to build and so is always preferred by the company
- To show how much change the project itself would cause compared with not building it
Show answer
Answer: D. Comparing with the future without the project isolates the project's own effects.
-
10. Which impact is both long-term and irreversible?
- Permanent flooding of a valley containing an ancient temple
- Dust from trucks during two years of building work
- Noise from piling work during the first six months
- Temporary diversion of a footpath around the site
Show answer
Answer: A. Flooding the valley is permanent and the temple cannot be restored; the others are temporary and reversible.
-
11. Three impacts are scored (magnitude × importance): A = 2 × 5, B = 4 × 4, C = 5 × 1. Rank them from most to least significant.
- B, A, C
- A, B, C
- C, B, A
- B, C, A
Show answer
Answer: A. A = 10, B = 16, C = 5. Order: B (16), A (10), C (5).
-
12. Why must the baseline cover the area downstream and downwind of a site, not only the site itself?
- Because land outside the site is always more polluted than the land inside it
- Because only areas outside the site are studied, never the site
- Because the law forbids any study of the site itself and its boundary
- Because pollution can travel beyond the boundary through water and air
Show answer
Answer: D. Rivers carry effluent downstream and wind carries dust and gases, so the affected area is larger than the site.
-
13. A project will destroy a grove. The company proposes to plant a new grove elsewhere, although redesigning the layout could have saved the grove. Under the mitigation hierarchy:
- Planting a new grove elsewhere is the best option, so the redesign is unnecessary
- Redesign to avoid the loss should come first; planting elsewhere is a last-resort offset
- Restoring and offsetting always come before avoiding, since avoiding is the costliest step
- The hierarchy applies only to pollution and does not apply to trees or forests
Show answer
Answer: B. Avoid comes first; offsetting is last, used only for harm that cannot be avoided, minimised or restored.
-
14. Baseline noise near a school is 45 units. Two new workshops each add 15 units and the limit is 70 (assume the contributions simply add). Which statement is correct?
- Each workshop alone stays within the limit, and both together also stay within it
- Each workshop alone exceeds the limit, and so both together exceed it too
- The baseline alone already exceeds the limit before any workshop is added
- Each workshop alone stays within the limit, but both together exceed it
Show answer
Answer: D. One workshop: 45 + 15 = 60, within 70. Both: 45 + 30 = 75, over 70. This is a cumulative effect. (Real noise does not add this simply; the numbers are for practice.)
-
15. Which statement correctly distinguishes SEA from project EIA?
- SEA assesses policies, plans and programmes; project EIA assesses individual projects
- SEA is done only after individual projects are completed, to review their effects
- SEA applies only to small projects, while project EIA covers policies and plans
- SEA replaces public consultation, while project EIA never involves the public
Show answer
Answer: A. Strategic environmental assessment works at the level of policies, plans and programmes, earlier than single projects.
How to use your result: questions 1-3 are from lesson 1 (what EIA is), 4-6 from lesson 2 (the EIA process), 7-9 from lesson 3 (screening and scoping), 10-12 from lesson 4 (baseline and impacts) and 13-15 from lesson 5 (mitigation, consultation, decision and monitoring). Revisit the lesson for any group where you missed more than one question.