- Foundation
- About 22 min
- 5 practice questions
Short run costs: TFC, TVC, TC, AFC, AVC, SAC and SMC
Define and calculate total fixed, total variable and total cost, average fixed, average variable and short run average cost, and short run marginal cost, and use their relationships to complete cost schedules.
If something looks wrong, please tell us.
By the end of this lesson you can
- Define TFC, TVC and TC and explain why only TVC changes with output in the short run.
- Calculate AFC, AVC, SAC and SMC from a schedule, using SAC = AVC + AFC.
- Use the facts that the sum of SMCs is TVC and that AVC is the average of SMCs.
In the short run some inputs are fixed, so some costs are fixed too. Splitting costs into fixed and variable parts, and then into totals, averages and marginal values, gives the toolkit the firm uses to decide how much to produce.
Total costs
- Total fixed cost (TFC): the cost of employing the fixed inputs. It does not change with output - it must be paid even when output is zero. Examples: rent of a shed, salary of a permanent watchman.
- Total variable cost (TVC): the cost of employing the variable inputs. It is zero at zero output and rises as output rises. Examples: raw material, wages of daily workers, power for machines.
- Total cost (TC) = TVC + TFC. At zero output TC equals TFC.
Average and marginal costs
AFC = TFC/q; AVC = TVC/q; SAC = TC/q = AVC + AFC; SMC = ΔTC/Δq, which in the short run equals ΔTVC/Δq.
Short run average cost (SAC) is total cost per unit of output. Average variable cost (AVC) and average fixed cost (AFC) are the variable and fixed costs per unit. Short run marginal cost (SMC) is the change in total cost per unit change in output; with one-unit steps, SMC of the qth unit = TC at q − TC at (q − 1). Because TFC cannot change in the short run, every change in TC comes from TVC, so SMC is also the extra variable cost of one more unit. All averages and SMC are undefined at zero output.
Worked example 1: a complete cost schedule (illustrative)
A made-up candle maker has fixed costs of ₹30 and the TVC shown. Working for selected rows: at q = 3, TC = 30 + 26 = 56; AFC = 30/3 = 10; AVC = 26/3 ≈ 8.67; SAC = 56/3 ≈ 18.67 (check: 10 + 8.67 = 18.67); SMC = 56 − 50 = 6. At q = 6, TC = 30 + 45 = 75; AFC = 30/6 = 5; AVC = 45/6 = 7.5; SAC = 75/6 = 12.5; SMC = 75 − 66 = 9.
| Output (q) | TFC (₹) | TVC (₹) | TC (₹) | AFC (₹) | AVC (₹) | SAC (₹) | SMC (₹) |
|---|---|---|---|---|---|---|---|
| 0 | 30 | 0 | 30 | - | - | - | - |
| 1 | 30 | 12 | 42 | 30 | 12 | 42 | 12 |
| 2 | 30 | 20 | 50 | 15 | 10 | 25 | 8 |
| 3 | 30 | 26 | 56 | 10 | 8.67 | 18.67 | 6 |
| 4 | 30 | 30 | 60 | 7.5 | 7.5 | 15 | 4 |
| 5 | 30 | 36 | 66 | 6 | 7.2 | 13.2 | 6 |
| 6 | 30 | 45 | 75 | 5 | 7.5 | 12.5 | 9 |
| 7 | 30 | 58 | 88 | 4.29 | 8.29 | 12.57 | 13 |
| 8 | 30 | 76 | 106 | 3.75 | 9.5 | 13.25 | 18 |
Useful relationships in the schedule
- Sum of SMCs = TVC. Up to 4 units: 12 + 8 + 6 + 4 = 30 = TVC at 4. Up to 6 units: 30 + 6 + 9 = 45 = TVC at 6.
- AVC is the average of the SMCs so far: at 4 units, 30/4 = 7.5.
- AFC × q = TFC at every output: 7.5 × 4 = 30, 3.75 × 8 = 30.
- SAC − AVC = AFC, so the gap between SAC and AVC shrinks as output rises: 30 at q = 1, only 3.75 at q = 8.
- For the first unit, SMC = AVC (both ₹12), because TVC of one unit is the cost of that unit.
Worked example 2: from TC to every other cost (illustrative)
A made-up firm's TC is ₹40, 64, 80, 90, 108 for outputs 0, 1, 2, 3, 4. Find TFC, TVC, AVC and SMC. Working: TFC = TC at zero output = ₹40 at every output. TVC = TC − 40: 0, 24, 40, 50, 68. AVC = TVC/q: 24/1 = 24, 40/2 = 20, 50/3 ≈ 16.67, 68/4 = 17. SMC = ΔTC: 64 − 40 = 24, 80 − 64 = 16, 90 − 80 = 10, 108 − 90 = 18. Check: 24 + 16 + 10 + 18 = 68 = TVC at 4. AVC falls while SMC is below it (16 and 10) and rises once SMC (18) exceeds it (16.67).
Worked example 3: finding TFC from AFC (illustrative)
A firm's AFC at 5 units is ₹12, and its TC at 5 units is ₹140. Working: TFC = AFC × q = 12 × 5 = ₹60. TVC at 5 units = 140 − 60 = ₹80; AVC = 80/5 = ₹16; SAC = 140/5 = ₹28 = 16 + 12.
Short run cost concepts
-
Total costs
- TFC: constant
- TVC: rises with output
- TC = TFC + TVC
-
Average costs
- AFC = TFC/q
- AVC = TVC/q
- SAC = TC/q = AFC + AVC
-
Marginal cost
- SMC = ΔTC/Δq = ΔTVC/Δq
- Sum of SMCs = TVC
Key takeaways: TFC is the cost of fixed inputs and does not vary with output; TVC varies; TC = TVC + TFC. AFC, AVC and SAC are per-unit costs with SAC = AVC + AFC. SMC = ΔTC/Δq and comes wholly from TVC in the short run; the sum of SMCs equals TVC and AVC is their average.
Check your understanding
-
1. A firm's TC is ₹50 at zero output and ₹90 at 4 units. TFC and TVC at 4 units are:
- TFC ₹90, TVC ₹50
- TFC ₹50, TVC ₹40
- TFC ₹40, TVC ₹50
- TFC ₹0, TVC ₹90
Show answer
Answer: B. At zero output TC = TFC = ₹50, and TFC stays ₹50 at every output. TVC at 4 units = 90 − 50 = ₹40.
-
2. TC is ₹120 at 5 units and ₹138 at 6 units (illustrative). SMC of the 6th unit is:
- ₹18
- ₹23
- ₹138
- ₹20
Show answer
Answer: A. SMC = TC at 6 − TC at 5 = 138 − 120 = ₹18.
-
3. With TFC = ₹60, AFC at 8 units of output is:
- ₹480
- ₹68
- ₹52
- ₹7.5
Show answer
Answer: D. AFC = TFC ÷ q = 60 ÷ 8 = ₹7.5.
-
4. SMCs of the first four units are ₹10, ₹7, ₹5 and ₹6 (illustrative). AVC at 4 units is:
- ₹6
- ₹28
- ₹7
- ₹5
Show answer
Answer: C. TVC at 4 units = sum of SMCs = 10 + 7 + 5 + 6 = ₹28. AVC = 28 ÷ 4 = ₹7.
-
5. Assertion (A): In the short run, marginal cost equals the change in total variable cost per extra unit. Reason (R): Total fixed cost does not change when output changes in the short run.
- Both A and R are true, and R is the correct explanation of A
- Both A and R are true, but R is not the correct explanation of A
- A is true, but R is false
- A is false, but R is true
Show answer
Answer: A. Both are true. Since TFC is constant, any change in TC is a change in TVC, so SMC = ΔTC/Δq = ΔTVC/Δq. R explains A.
Sign in to keep track of the lessons you finish.