Liquid waste sums: sewage flow, BOD load, removal in series and sludge
Calculate sewage flow from population, BOD load in kilograms a day, overall removal across treatment stages, population equivalent and sludge volume with a solids balance.
If something looks wrong, please tell us.
Questions on sewage and wastewater are mostly unit questions with a little biology behind them. One unit trick unlocks most of them: a concentration of 1 mg per litre is the same as 1 gram per cubic metre. This lesson builds the sums step by step. All numbers are illustrative values chosen for practice.
The unit trick
Flow is given in litres or cubic metres per day, and concentration in mg per litre. Since 1 m³ = 1,000 litres, a concentration of 1 mg/L means 1,000 mg, which is 1 g, in every cubic metre. So load in grams per day = concentration in mg/L × flow in m³ per day. Divide by 1,000 to get kilograms per day.
Load (g/day) = concentration (mg/L) × flow (m³/day). Divide by 1,000 for kg/day. Overall removal in series = 1 − product of (1 − each removal).
Worked example 1: flow and load
A town has 40,000 people. Each is supplied 120 litres a day, and suppose 80 per cent becomes sewage. Sewage per person = 120 × 0.80 = 96 litres. Flow = 40,000 × 96 = 3,840,000 litres = 3,840 m³ a day. If the raw sewage BOD is 250 mg/L, the BOD load = 250 × 3,840 = 960,000 g = 960 kg a day. Never forget to convert litres to cubic metres before using the g/m³ trick.
Treatment in series
Stages work one after another, each on what the last one leaves. If primary treatment removes 30 per cent of the BOD and secondary treatment removes 90 per cent of what remains, the BOD fraction left is 0.70 × 0.10 = 0.07, so the overall removal is 93 per cent, not 120 per cent. For the above town the BOD after secondary treatment = 250 × 0.07 = 17.5 mg/L, and the load discharged = 17.5 × 3,840 ÷ 1,000 = 67.2 kg a day. As a check, 960 × 0.07 = 67.2 kg a day.
Population equivalent
The pollution from a factory or institution can be compared with that of people by the population equivalent (PE): PE = BOD load from the source ÷ BOD load per person per day. Suppose, illustratively, a person contributes 60 g of BOD a day. A dairy discharging 120 kg of BOD a day has PE = 120,000 g ÷ 60 g = 2,000 persons. This is not the number of workers; it is the number of people whose sewage would carry the same BOD.
Worked example 2: sludge volume
The settled solids from treatment are removed as sludge, which is mostly water. Suppose 500 kg of dry solids a day is produced as sludge with 4 per cent solids. Sludge mass = 500 ÷ 0.04 = 12,500 kg, which has a volume of about 12.5 m³ (density close to 1,000 kg/m³). If thickening raises the solids to 8 per cent, the mass becomes 500 ÷ 0.08 = 6,250 kg, or 6.25 m³, which is half. The dry solids have not changed; only the water has. This is the same solids balance as in the composting and biogas sums.
Common traps
- Using litres in the load formula: convert flow to m³.
- Adding removal percentages for stages in series instead of multiplying what is left.
- Treating population equivalent as a count of employees.
- Forgetting that sludge is mostly water, so its volume depends on its solids content.
- Reading BOD as the amount of organic matter in grams: it is the oxygen demand.
Key takeaways
1 mg/L equals 1 g/m³, so load equals concentration times flow. Overall removal in series multiplies the fractions left. Population equivalent compares a load with one person's load. Sludge volume follows from dry solids divided by the solids fraction.
Check your understanding
-
1. 50,000 people each send 100 litres of sewage a day to a plant. What is the daily flow?
- 500 m³
- 50,000 m³
- 5,000 m³
- 5 m³
Show answer
Answer: C. 50,000 × 100 = 5,000,000 litres = 5,000 m³.
-
2. Sewage with BOD of 300 mg/L flows at 2,000 m³ a day. What is the BOD load?
- 600 kg a day
- 6,000 kg a day
- 0.6 kg a day
- 60 kg a day
Show answer
Answer: A. Load = 300 g/m³ × 2,000 m³ = 600,000 g = 600 kg a day.
-
3. Two stages remove 40 per cent and then 85 per cent of what enters them. What is the overall removal?
- 125 per cent
- 85 per cent
- 62.5 per cent
- 91 per cent
Show answer
Answer: D. Fraction left = 0.60 × 0.15 = 0.09, so overall removal is 91 per cent.
-
4. An institution discharges 90 kg of BOD a day. A person contributes 60 g a day. What is the population equivalent?
- 150
- 1,500
- 15,000
- 5,400
Show answer
Answer: B. PE = 90,000 g ÷ 60 g = 1,500.
-
5. 300 kg of dry solids a day is removed as sludge of 5 per cent solids. What is the sludge volume per day (density 1,000 kg/m³)?
- 6 m³
- 15 m³
- 60 m³
- 0.6 m³
Show answer
Answer: A. Sludge mass = 300 ÷ 0.05 = 6,000 kg = 6 m³. The 15 comes from multiplying instead of dividing.