- Practice
- About 13 min
- 5 practice questions
Efficiency percentages and time saved
Convert 'x% more efficient' into ratios and time changes, and handle jobs in which the speed changes part-way.
If something looks wrong, please tell us.
Practice questions often express speed as a percentage: 'A is 20% more efficient than B' or 'the workers become 25% faster'. The trap is that time does not change by the same percentage as efficiency. This lesson gives a reliable way to convert percentages into ratios, and then into time, and shows how to deal with jobs where the speed changes part-way.
From percentage to ratio
Take the slower or original efficiency as 100 parts. If A is 20% more efficient than B, then when B is 100, A is 120, a ratio of 6 : 5. The time ratio is the reverse, 5 : 6. So if B takes 24 days, A takes 24 × 5/6 = 20 days. If A is only 60% as efficient as B, then A : B = 60 : 100 = 3 : 5, and the time ratio is 5 : 3, so A takes 5/3 times as long as B.
A table to remember
| Efficiency changes by | New time is | Time changes by |
|---|---|---|
| +25% | 4/5 of old time | 20% less |
| +50% | 2/3 of old time | 33 1/3% less |
| +100% | 1/2 of old time | 50% less |
| −20% | 5/4 of old time | 25% more |
| −50% | 2 times old time | 100% more |
Each row follows from the same rule: new time = old time ÷ (new efficiency ÷ old efficiency). For +25%, the new efficiency is 125 and the old is 100, so the new time is 100/125 = 4/5 of the old time.
Worked example 1
A is 20% more efficient than B. B takes 24 days. How long does A take? A : B efficiency is 120 : 100 = 6 : 5, so the time ratio is 5 : 6. B's 6 parts equal 24 days, so one part is 4 days, and A takes 5 × 4 = 20 days.
Worked example 2
A is 60% as efficient as B. B can finish a job in 15 days. How long does A take? A : B = 3 : 5, so the time ratio is 5 : 3. B's 3 parts equal 15 days, so one part is 5 days, and A takes 5 × 5 = 25 days.
Worked example 3: a job takes less time
A job takes a worker 40 days. After training her efficiency increases by 25%. How many days does she now need, and how many does she save? The new time is 4/5 of 40 = 32 days. She saves 8 days, which is 20% of the old time.
Worked example 4: speed changes part-way
A worker normally finishes a job in 40 days. For the first 10 days he works at only 80% of his normal efficiency, and after that at full efficiency. How long does the whole job take? In the first 10 days he does the work of 80% of 10 = 8 normal days. The remaining work is 40 − 8 = 32 normal days, done at full speed in 32 days. The total is 10 + 32 = 42 days, so he is 2 days late.
Efficiency up by x% does not cut time by x%. Convert to a ratio, reverse it for time, then apply it to the known time.
Worked example 5: a team
A team of workers finishes a job in 30 days. If their efficiency falls by 20%, how long will the same job take? New efficiency is 80% of the old, so the new time is 30 ÷ 0.8 = 37.5 days, which is 25% more. Check with ratios: efficiency 4 : 5 means time 5 : 4, so 30 × 5/4 = 37.5.
Common slips
- Thinking that 25% more efficiency means 25% less time. It means 20% less time.
- Using the wrong base. Always take the person or machine you are compared with as 100.
- Forgetting to reverse the ratio when moving from efficiency to time.
- In part-way changes, treating the slow days as normal days. Convert the slow days to normal-day equivalents first.
Key takeaways
- Efficiency ratio and time ratio are reverses.
- x% more efficiency gives time of 100/(100 + x) of the old time.
- Convert slow or fast stretches into normal-day equivalents.
- Always check the answer by comparing the two rates directly.
Check your understanding
-
1. A is 20% more efficient than B. B takes 24 days. How long does A take?
- 20 days
- 18 days
- 19.2 days
- 28.8 days
Show answer
Answer: A. Efficiency A : B = 6 : 5, so time A : B = 5 : 6. Time for A = 24 × 5/6 = 20 days.
-
2. If a worker's efficiency increases by 25%, by what percentage does the time for the same job decrease?
- 25%
- 30%
- 15%
- 20%
Show answer
Answer: D. New time = 100/125 = 80% of the old time, so it decreases by 20%.
-
3. If a worker's efficiency falls by 20%, by what percentage does the time for the same job increase?
- 20%
- 25%
- 15%
- 30%
Show answer
Answer: B. New time = 100/80 = 125% of the old time, an increase of 25%.
-
4. A is 60% as efficient as B, and B takes 15 days. How long does A take?
- 9 days
- 20 days
- 30 days
- 25 days
Show answer
Answer: D. A : B = 3 : 5 in efficiency, so the time ratio is 5 : 3. A takes 15 × 5/3 = 25 days.
-
5. A worker normally needs 40 days. For the first 10 days he works at 80% efficiency, then at full efficiency. How many days in all?
- 40 days
- 42 days
- 45 days
- 50 days
Show answer
Answer: B. 10 days at 80% equal 8 normal days. 32 normal days remain, so the total is 10 + 32 = 42 days.
Sign in to keep track of the lessons you finish.