• Practice
  • About 14 min
  • 5 practice questions

Mixed time-and-work drill: choosing the method

Practise matching each question to the right method: rates, units, man-days, pipes or ratios, with fully worked solutions.

If something looks wrong, please tell us.

In a test you do not know which topic comes next. The skill is to look at a question for a few seconds and decide on the method. This lesson gives a quick guide for choosing, then a drill of six mixed problems with full working. Try each problem yourself before reading the solution.

Choosing the method

If the question saysUseFirst step
Two or three people work togetherRates or unitsTake LCM of times as total units
Someone leaves or joinsWork done in stagesCompute work done before the change
Men, days, hoursMan-days or man-hoursFind total man-days
Pipes, tank, leakUnits; fill is +, empty is −Net units per hour
Twice as fast, 25% moreRatio of efficiencyReverse it for times
Money sharedRatio of work doneParts method

Problem 1: working together

A takes 6 days and B takes 12 days. Together? Take 12 units: A does 2 and B does 1, so 3 units a day. The job takes 12 ÷ 3 = 4 days.

Problem 2: one leaves

A takes 12 days and B takes 24 days. They start together, and A leaves after 4 days. Take 24 units: A does 2 and B does 1 per day. In 4 days they do 12 units. B finishes the other 12 units in 12 days. Total time = 4 + 12 = 16 days.

Problem 3: pipes

An inlet fills a tank in 8 hours and an outlet empties it in 12 hours. With both open, how long to fill the empty tank? Take 24 units: the inlet adds 3 an hour and the outlet removes 2 an hour. The net rate is 1 unit an hour, so the tank fills in 24 hours.

Problem 4: men and days

Fifteen men finish a job in 20 days. How many days will 25 men take? Total work is 15 × 20 = 300 man-days. 25 men take 300 ÷ 25 = 12 days. More men, fewer days: the answer moves the right way.

Problem 5: three workers

A, B and C can do a job alone in 10, 15 and 30 days. Together? Take 30 units: A does 3, B does 2 and C does 1, a total of 6 units a day. The job takes 30 ÷ 6 = 5 days.

Problem 6: efficiency and wages

A is twice as efficient as B. Together they finish a job in 8 days and are paid Rs 2,400. How long does each take alone, and what is each share? Each day A does 2 parts and B does 1, so 3 parts a day. The job is 24 parts. A takes 24 ÷ 2 = 12 days and B takes 24 ÷ 1 = 24 days. The work ratio is 2 : 1, so A gets Rs 1,600 and B gets Rs 800.

Read the question, name the topic, choose units, then solve. A wrong method wastes more time than a slow calculation.

— Test strategy

Timing and review

Practise in rounds. In the first round, give each problem no more than two minutes and mark those that take longer. In the second round, return to the marked problems and write out the method before you calculate. Note down any problem you solved by a long route, and then find the shortcut. For example, in Problem 5 the long route adds 1/10 + 1/15 + 1/30, while the units route needs only three small divisions.

Key takeaways

  • Identify the pattern before you calculate.
  • Use the LCM of the times as units whenever people share a job.
  • Check the direction of the answer: more workers means fewer days.
  • Check any money share by adding it back to the total.

Check your understanding

  1. 1. A takes 6 days and B takes 12 days. How long do they take together?

    1. 3 days
    2. 9 days
    3. 6 days
    4. 4 days
    Show answer

    Answer: D. With 12 units, A does 2 and B does 1, so 3 a day: 12 ÷ 3 = 4 days.

  2. 2. A takes 15 days and B takes 30 days. They start together and A leaves after 5 days. How long does the job take in all?

    1. 10 days
    2. 20 days
    3. 15 days
    4. 25 days
    Show answer

    Answer: B. With 30 units: A does 2, B does 1; 5 days give 15 units; B does the other 15 in 15 days; total 20 days.

  3. 3. An inlet fills a tank in 10 hours and an outlet empties it in 15 hours. With both open, how long to fill the empty tank?

    1. 25 hours
    2. 6 hours
    3. 12 hours
    4. 30 hours
    Show answer

    Answer: D. With 30 units: inlet 3, outlet 2, net 1 an hour, so 30 hours.

  4. 4. Eighteen men finish a job in 25 days. How many days will 30 men take?

    1. 15 days
    2. 10 days
    3. 20 days
    4. 30 days
    Show answer

    Answer: A. Total 18 × 25 = 450 man-days; 450 ÷ 30 = 15 days.

  5. 5. A is twice as efficient as B. Together they finish a job in 12 days. How long does B take alone?

    1. 24 days
    2. 18 days
    3. 36 days
    4. 48 days
    Show answer

    Answer: C. A does 2 parts and B does 1 part a day, so the job is 36 parts. B does 1 part a day and takes 36 days.

Sign in to keep track of the lessons you finish.

Next lesson → Final self-assessment: Time and Work

Privacy · Terms · Refunds · Delivery