- Practice
- About 13 min
- 5 practice questions
Wages, efficiency and mixed problems
Share wages in proportion to work done and compare efficiencies between workers.
If something looks wrong, please tell us.
In the last lesson, we meet the problems with a twist: money is shared according to work, or one worker is stated to be a multiple of another.
Wages
Wages are divided in the ratio of the work done, which is the ratio of daily rates when they work for the same number of days.
Question: A takes 6 days and B takes 12 days for a job; they share ₹900 for working together. Working: Rates 1/6 : 1/12 = 2 : 1. A gets ₹600 and B gets ₹300. Answer: ₹600 and ₹300.
Efficiency comparison
Question: A is twice as efficient as B. Together they finish a job in 12 days. How long does A alone take? Working: Let B's rate be x, so A's is 2x. Together 3x = 1/12, so x = 1/36. A's rate = 1/18. A alone takes 18 days (and B takes 36). Answer: 18 days.
Leaving the job
Question: A can finish a job in 10 days and B in 15 days. A works for 4 days and then B finishes it. How long does B take? Working: A does 4/10 = 2/5. Left: 3/5. B does 1/15 per day, so 3/5 ÷ 1/15 = 9 days. Answer: 9 days.
Wages are shared in the ratio of work done. Faster workers take proportionally fewer days.
Key takeaways: wages follow work done; an efficiency ratio is the inverse of the time ratio; and check by ensuring parts add up to 1.
Check your understanding
-
1. A can do a job in 10 days and B in 15 days. They do it together and are paid ₹1,500. What is A's share?
- ₹600
- ₹750
- ₹900
- ₹1,000
Show answer
Answer: C. Working the same days, wages follow daily rates: 1/10 : 1/15 = 3 : 2. A gets 3/5 of ₹1,500 = ₹900 (B gets ₹600).
-
2. A is twice as efficient as B. Together they finish a job in 14 days. How long would B alone take?
- 21 days
- 28 days
- 35 days
- 42 days
Show answer
Answer: D. Let B's rate be x, so A's is 2x. Together 3x = 1/14, so x = 1/42. B alone takes 42 days (and A takes 21).
-
3. A can finish a job in 12 days and B in 18 days. A works for 3 days and then B finishes the rest. How many days does B work?
- 12 days
- 13.5 days
- 15 days
- 9 days
Show answer
Answer: B. A does 3/12 = 1/4, leaving 3/4. B does 1/18 per day, so he needs 3/4 × 18 = 13.5 days.
-
4. A is 50% more efficient than B. If B takes 30 days to finish a job, how long does A take?
- 20 days
- 15 days
- 45 days
- 25 days
Show answer
Answer: A. Efficiency ratio A : B = 1.5 : 1 = 3 : 2, so the time ratio is the inverse, 2 : 3. A takes 30 × 2/3 = 20 days. (45 days is the trap of multiplying instead of dividing.)
-
5. A, B and C can finish a job in 6, 8 and 12 days. They do it together and are paid ₹1,800. What is C's share?
- ₹300
- ₹400
- ₹600
- ₹800
Show answer
Answer: B. Daily rates 1/6 : 1/8 : 1/12. Multiply by 24: 4 : 3 : 2, total 9 parts. C gets 2/9 of ₹1,800 = ₹400.
Sign in to keep track of the lessons you finish.