  1. 1. Match the stage to its output: screening, scoping, mitigation.

    1. Terms of reference; level of assessment; baseline data
    2. Baseline data; environmental management plan; terms of reference
    3. Approval letter; baseline data; compliance report
    4. Level of assessment; terms of reference; environmental management plan
    Show answer

    Answer: D. Screening sets the level, scoping writes terms of reference, and mitigation produces the environmental management plan.

  2. 2. A regulator approves a project and later finds the report omitted a nearby wetland that local people knew about. Which two stages should have caught it?

    1. Scoping and public consultation
    2. Screening and the decision
    3. Monitoring and audit
    4. Mitigation and monitoring
    Show answer

    Answer: A. Choosing which issues to study is scoping; consultation draws on local knowledge and is a second chance to catch omissions.

  3. 3. Which statement about roles in EIA is correct?

    1. The authority prepares the report and the proponent approves it
    2. The public prepares the report and the courts approve it
    3. The proponent prepares the report and the authority reviews it and decides
    4. No one reviews the report once written
    Show answer

    Answer: C. The proponent, usually through consultants, prepares the EIA; the regulatory authority, advised by experts, reviews it and decides.

  4. 4. A study must find the least damaging corridor for a transmission line across forests, villages and rivers. The most suitable method is:

    1. A network of cause and effect
    2. A simple checklist
    3. A questionnaire on project costs
    4. Overlay mapping
    Show answer

    Answer: D. Route selection is a spatial problem; overlay mapping, now done in GIS, shows where constraints lie.

  5. 5. Weights: forest 4, water 3, people 3. Site P scores 3, 2, 2 and site Q scores 1, 4, 3 (higher = worse). Which site has the lower weighted impact?

    1. Site Q, 23 against 24
    2. Site P, 7 against 8
    3. Site P, 24 against 25
    4. They are equal at 24
    Show answer

    Answer: C. P = 4×3 + 3×2 + 3×2 = 12 + 6 + 6 = 24. Q = 4×1 + 3×4 + 3×3 = 4 + 12 + 9 = 25. P is lower.

  6. 6. Which method's main strength is revealing indirect, second- and third-order effects?

    1. Overlays
    2. Checklists
    3. Simple lists of laws
    4. Networks
    Show answer

    Answer: D. Networks trace cause-and-effect chains and so expose indirect effects.

  7. 7. A river of 12 m³/s at 1 mg/L receives 3 m³/s of effluent at 26 mg/L. The fully mixed concentration is:

    1. 6 mg/L
    2. 13.5 mg/L
    3. 5.2 mg/L
    4. 7.5 mg/L
    Show answer

    Answer: A. Loads: 12 × 1 = 12 and 3 × 26 = 78; total 90; total flow 15; 90 ÷ 15 = 6 mg/L.

  8. 8. A river of 5 m³/s at 2 mg/L receives 1 m³/s of effluent. What effluent concentration keeps the river at 5 mg/L after mixing?

    1. 25 mg/L
    2. 15 mg/L
    3. 20 mg/L
    4. 30 mg/L
    Show answer

    Answer: C. (5 × 2 + 1 × Ce) ÷ 6 = 5, so 10 + Ce = 30, Ce = 20 mg/L.

  9. 9. In the dry season the river flow halves while the effluent stays the same. Compared with the wet season, the effluent's share of the mixed flow:

    1. Decreases, so dilution improves
    2. Increases, so the same discharge raises the river concentration more
    3. Stays the same, since only concentration matters
    4. Becomes zero
    Show answer

    Answer: B. With less river water the effluent forms a larger share of the mix, so dilution is weaker in the dry season.

  10. 10. An air basin can absorb 150 units a day; existing sources use 108; each proposed kiln adds 12. How many kilns can be approved?

    1. 3
    2. 4
    3. 12
    4. 2
    Show answer

    Answer: A. Remaining = 150 − 108 = 42. 42 ÷ 12 = 3.5, so 3 kilns (36 units); a fourth would bring the total to 156.

  11. 11. Which of these is an example of strategic environmental assessment?

    1. Assessing the dust from one crusher
    2. Monitoring a single factory's effluent
    3. Approving one highway with conditions
    4. Assessing a regional plan for several industrial parks before any park is proposed
    Show answer

    Answer: D. SEA assesses policies, plans and programmes, such as a regional plan, before individual projects.

  12. 12. Why does SEA help with cumulative impacts?

    1. It studies each project only after construction
    2. It removes the need for any baseline
    3. It assesses each project separately in isolation
    4. It looks at many planned activities together, early enough to change the plan
    Show answer

    Answer: D. Working at plan level lets SEA judge combined effects and choose alternatives before projects are fixed.

  13. 13. A source of 400 units passes through a scrubber removing 75 per cent and then a filter removing 60 per cent of what remains. The residual and overall removal are:

    1. 0 units; 135 per cent
    2. 40 units; 90 per cent
    3. 100 units; 75 per cent
    4. 60 units; 85 per cent
    Show answer

    Answer: B. After the scrubber: 400 × 0.25 = 100. After the filter: 100 × 0.4 = 40. Removal = 360 ÷ 400 = 90 per cent.

  14. 14. An EIA recommends refusing a project because it may cause serious, irreversible harm to an aquifer, although the evidence is not yet conclusive. Which principle does this apply?

    1. Polluter-pays principle
    2. Precautionary principle
    3. Project splitting
    4. Common but differentiated responsibilities
    Show answer

    Answer: B. Acting to prevent possible serious, irreversible harm despite incomplete evidence is the precautionary principle.

  15. 15. Two adjoining 70-hectare quarries owned by one group are submitted as separate projects, and an imaginary rule requires full assessment above 100 hectares. What is the correct response?

    1. Approve both without assessment, since each is below 100 hectares
    2. Assess only the first application
    3. Screen them together as one 140-hectare project and assess cumulative effects
    4. Treat it as SEA and skip project EIA
    Show answer

    Answer: C. This is project splitting. Linked projects should be screened together; combined they total 140 hectares, above the threshold.

How to use your result: questions 1-3 are from lesson 1 (the EIA cycle and roles), 4-6 from lesson 2 (identification methods), 7-9 from lesson 3 (mixing, loads and standards), 10-12 from lesson 4 (cumulative impacts and SEA) and 13-15 from lesson 5 (mitigation, monitoring and weak spots). Revisit the lesson for any group where you missed more than one question.