Every job, however large, can be thought of as one whole, or 1. If a part of the job is done, the rest is what is left from 1. Thinking in fractions makes it easy to answer questions like 'how much is still to do?' and 'how many more days are needed?'. This lesson uses only simple fractions and plenty of small steps.

One day's work

If a worker can finish a job in 20 days, then in one day she does 1/20 of the job. In 8 days she does 8 × 1/20 = 8/20 = 2/5 of the job. The reasoning is just like finding how many pages of a book you read if you read the same amount each day.

Work left

Work left is found by subtracting the work done from 1. After 8 days the work left is 1 − 2/5 = 3/5. To find how many more days she needs for the rest, divide the work left by the work done in one day: 3/5 ÷ 1/20 = 3/5 × 20 = 12 days. Notice that 12 is also 20 − 8, which makes sense: if she works at the same pace, the days she has left are the days she still owes.

How many more days?

  1. One day: 1/20 She can finish the job in 20 days.
  2. Done in 8 days: 2/5 8 × 1/20 = 8/20.
  3. Left: 3/5 1 − 2/5.
  4. More days: 12 3/5 ÷ 1/20 = 3/5 × 20.

Work left = 1 − work done. Days needed = work left ÷ work per day.

— Rule to remember

Worked example 1

A worker does 1/12 of a job each day. How many days does he need to do 3/4 of the job? Days = 3/4 ÷ 1/12 = 3/4 × 12 = 36/4 = 9 days. Check: in 9 days he does 9 × 1/12 = 9/12 = 3/4.

Worked example 2

A worker does 1/3 of a job in 5 days. How long does the whole job take? If one-third takes 5 days, the whole job (three thirds) takes 3 × 5 = 15 days. In one day he does 1/15 of the job.

Worked example 3

A can finish a job in 15 days. She works for 6 days and then leaves. B, who can finish the same job in 10 days, completes the rest. How many days does B work? In 6 days A does 6/15 = 2/5 of the job. Work left = 1 − 2/5 = 3/5. B does 1/10 per day, so B needs 3/5 ÷ 1/10 = 3/5 × 10 = 6 days.

Worked example 4: who is faster?

A does 2/5 of a job in 6 days and B does 1/3 of the same job in 4 days. Who takes less time for the whole job? A: 6 days for 2/5, so the whole job needs 6 ÷ 2/5 = 6 × 5/2 = 15 days. B: 4 days for 1/3, so the whole job needs 4 × 3 = 12 days. B is faster, since 12 is less than 15.

Writing the answer correctly

Always check what the question asks. 'How many more days?' needs only the days after the stop. 'How many days in all?' needs the days already worked as well. In example 3, if the question had asked for the total time from the start, the answer would be 6 + 6 = 12 days.

Common slips

  • Dividing the wrong way round. If a worker does 1/12 of a job per day, 3/4 of a job takes 3/4 ÷ 1/12 = 9 days, not 1/12 ÷ 3/4.
  • Mixing up 'work left' with 'days left'. They are different quantities, so write the units next to each.
  • Adding the days of two workers when they work one after the other for different parts. Work out each part's fraction first.
  • Forgetting to simplify the fraction, which makes the next division harder.

Key takeaways

  • The whole job is 1; a part done is a fraction of it.
  • A worker who needs n days does 1/n of the job per day.
  • Work left = 1 − work done.
  • Days needed = work left ÷ work per day.
  • Read whether the question asks for extra days or total days.

Check your understanding

  1. 1. A worker does 1/12 of a job each day. How many days does he need to do 3/4 of it?

    1. 8
    2. 9
    3. 12
    4. 16
    Show answer

    Answer: B. 3/4 ÷ 1/12 = 3/4 × 12 = 9 days.

  2. 2. A worker does 1/3 of a job in 5 days. How long does the whole job take?

    1. 8 days
    2. 10 days
    3. 12 days
    4. 15 days
    Show answer

    Answer: D. One third takes 5 days, so the whole job takes 3 × 5 = 15 days.

  3. 3. A can finish a job in 20 days. She works for 8 days. What fraction of the job is left?

    1. 3/5
    2. 2/5
    3. 8/20
    4. 1/3
    Show answer

    Answer: A. She does 8/20 = 2/5, so 1 − 2/5 = 3/5 is left.

  4. 4. A can finish a job in 15 days and works for 6 days. B, who finishes it in 10 days, does the rest. How many days does B work?

    1. 4
    2. 9
    3. 6
    4. 3
    Show answer

    Answer: C. A does 6/15 = 2/5, leaving 3/5. B does 1/10 per day, so 3/5 ÷ 1/10 = 6 days.

  5. 5. A worker does 2/5 of a job in 6 days. How long will the whole job take at that pace?

    1. 12 days
    2. 10 days
    3. 15 days
    4. 18 days
    Show answer

    Answer: C. 6 ÷ 2/5 = 6 × 5/2 = 15 days.